pin up uzbekistanProject Management (Primavera P6)
The Project Management Life Cycle
- Project Management Life Cycle
- Five Process Groups in the Project Management Life Cycle
- Project Management Process Flow Diagram
Data, Navigation, and Layouts
- Starting P6
- Log in Dialog Box
- Open an Existing Project
- Navigate in the Project, Activity & WBS Windows
- What is a Layout?
- Opening an Existing Layout
- Customizing a Layout
- Selecting Columns
- Displaying Activity Details
- Selecting Detail Tabs
- Saving Layouts
- Closing a Project
Enterprise Project Structure
- Enterprise Project Structure
- View the EPS
Organizational Breakdown Structure (OBS)
- Organizational Breakdown Structure
- Viewing the OBS/Responsible Managers
- General Tab
- Responsible Tab
Creating a Project
- Create a project
- Navigate in the Projects window
- View and Modify Information in Project Details
- Importing a File
- Projects Window
- Projects Detail Tabs
- General Tab
- Dates Tab
- Codes Tab
- Defaults Tab
- Resources Tab
- Settings Tab
Creating a Work Breakdown Structure
- Work Breakdown Structure
- Create Multiple Levels of a WBS Hierarchy
- View/Hide WBS Elements
Adding Activities
- What are Activities
- Activity Types
- Add activities
- Deleting Activities
- Dissolving Activities
- General Tab
- Activity Status
- Copy Activities
- Undo
- Assign Activity Codes to Activities
- Activity Attributes
Creating Relationships
- Network Logic Diagram
- Relationship Types
- Finish-to-Start (FS)
- Start-to-Start (SS)
- Finish-to-Finish (FF)
- Start-to-Finish (SF)
- Relationships with Lag
- Create Relationships in the Activity Network
- Create Relationships in Activity Details
- View/Hide Relationships in the Gantt Chart
Scheduling
- Critical Path
- Critical Path Method (CPM) Scheduling
- Float and its Impact on Schedule
- Types of Float (Total & Free Float)
- Loops and Open Ends Activities
- Calculate a schedule
- Analyze the Scheduling Log Report
- Forward & Backward Pass
- Driving Relationships
- Scheduling Summary
Assigning Constraints
- Constraints
- Must Finish By
- Additional Constraints
- Start On
- Start On or Before
- Finish On
- Finish On or Before
- Finish On or After
- Mandatory Start and Finish
Formatting Schedule Data
- Group & Sort Activities
- Create a Filter
- Applying a Filter
Resources and Costs
- Describe Resources
- Viewing the Resource Dictionary
- Difference b/w Labor, Non-Labor And Material Resources
- Units & Price
- Adding a Resource
- Assign Resources and Cost
- Assigning Activity Codes
- Resource Curves
Analyzing Resources
- Resource Usage Profile
- Format a Profile
- Format the Timescale
- Displaying the Cost Profile
Optimizing the Project Plan
- Analyze the Project Schedule
- Shorten a Project Schedule
- Analyzing Schedule Dates
- Compare the Finish Date to the Must Finish by Date
- Focus on Critical Activities
- Analyze Resource Availability
- Remove Resource Over-Allocation
- Analyzing the Budget/Cash flow
Baselining the Project Plan
- What is a Baseline?
- Creating a Baseline
- Assigning a Baseline
- Display Baseline Bars on the Gantt Chart
Updating the Plan
- Updating a Project
- What is the Data Date?
- Enter Actual Values
- Update Completed Activities
- Update In-progress Activities
Project Execution and Control
- Progress Spotlight
- Reschedule the Project
Reporting Performance
- Methods for Performance Reporting
- Reports
- Run Schedule Report
- Print Preview & Page Setup
- Creating & Saving a Report
- Comparison of Baseline & Update